| Compressive Strength | ~13 Mpa (7 days) / ~20 Mpa (28 days) |
| Flexural Strength | ~3 Mpa (7 days) / ~4 Mpa (28 days) |
| Working Time | 1 hour |
| Pouring Thickness | 1cm to 8cm in a single pour |
| Water Ratio | 40% - 43% |
Subfloor Preparation: Scrupulously remove oil stains, dust, and debris. Sand away irregularities to eliminate loose concrete. Ensure the base is bone-dry.
Mixing: Use 8 liters of clean water per 20kg bag. Mix until lump-free. Use a notched trowel to spread and a defoaming roller to remove air bubbles.
Conditions: Temperature should be between 5°C and 30°C. Apply mixed material within 20 minutes.