1 / 5
| Customization: | Available |
|---|---|
| Appearance: | Powder |
| Color: | Gray |
| ITEM | Technical Parameters |
|---|---|
| Water-cement Ratio | 0.25:1 |
| Product Status | Gray or white powder |
| Construction Temperature | 5-35℃ |
| Operational Time | 2hrs |
| Opening Hours | 15min |
| Time to bear load | ≥24hrs |
| Reference dosage | 1.5kg/m2·mm |
The wall must be clean and solid, no hollow, no mold release agents, no wax stains. Painted surfaces should be rough chiseled to expose at least 80% of the original surface. Newly plastered surfaces should maintain for at least 7 days before tiling.
Mix tile glue with water in proportion (20kg powder: 4.5-5kg water). Add water first, then pour the powder. Stir well with an electric mixer until smooth.
Scraping method with trowel for double-sided (for smooth wall) or traditional paste method (for uneven surfaces).
It can be used for plastering, concrete, brick wall covering, ceramic tiles, ceramic mosaics, and small natural stone installations.
Shengchuang Building